Irene House
Project:
Irene House, 218 Balham High Street, London, SW12 9BX
Value:
£70,000
Duration:
8 weeks
About the Project:
The works at Irene House were conducted as part of a remodelling programme of a 1950s steel framed office block.
The building contained various licensed and non-licensed asbestos containing materials.
EAS used a variety of asbestos removal techniques including wet shot blasting, removal of insulation to pipework, mechanical grinding of bitumen adhesive and removal of floor tiles.
The main aspect of work requiring the most attention was the removal and disposal of asbestos waste. Due to the amount of waste generated, dedicated waste run timeframes and routes were agreed with the client ensuring works for other trades on site were not impacted.
The project was completed within the required timescale and positive feedback was received from our client.